In 2015 Elia launched the huge project of renewal of the overhead electricity lines named “Boucle de l’Est”. The aim of the company is to replace and upgrade the connection grid in the east of the Province of Liège and this will be done in two phases.
LUXSOLAR, to warn the presence of the pylons part of the Boucle de l’Est Project, has been asked to provide complete AWL systems composed by MIOL-AB (20.000cd white flash during the day and 2.000cd red flash during the night) and LIOL-B (32cd red steady during the night) and systems composed by MIOL-B (2.000cd red flash during the night) and LIOL-B (32cd red steady during the night).